Hemel Kitchen Fitters Get a quote
Kitchen Fitters · Hemel Hempstead

Open-Plan Kitchens in Hemel Hempstead

Open-plan kitchens in Hemel Hempstead: a kitchen designed and fitted for the bigger room once the wall between kitchen and dining room is opened, with the structural work done first by a builder.

What's involved

What Open-Plan Kitchens in Hemel Hempstead involves

01

Designed for the new room

The layout planned for the opened-up space, so the kitchen, dining area and walkways work together rather than as two rooms with a gap.

02

Planned around the builder

The kitchen design is settled early, so the builder knows where the opening and services need to be, and the fit follows once the structural work is signed off.

03

Services moved once

Sink, cooker and appliance positions fixed at the design stage, so pipes and cables are only moved once.

04

Islands and peninsulas

An island or peninsula planned where the wall used to be, with the clearance around it checked before anything is ordered.

05

Utility room from the old kitchen

Where the kitchen moves into the dining room, the old space is planned as a utility, with the plumbing already there.

Knocking the kitchen into the dining room is the change that transforms the new-town houses around Hemel, because they were built with small separate rooms. The opening itself is structural work for a builder, with a structural engineer and Building Control; the kitchen is what gets designed and fitted into the bigger room once that work is finished.

Open-plan projects in Hemel are often part of a bigger change: the kitchen moved into the dining room, the old kitchen turned into a utility, and the back door moved. Planning the whole layout at once means the builder opens the wall in the right place and the plumbing is only moved once.

More from Hemel Kitchen Fitters

Other kitchen services

Good to know

Asked about Open-Plan Kitchens

Who does the structural work?

A builder, working to calculations from a structural engineer, with Building Control sign-off. The kitchen is designed around the opening and fitted once that work is complete.

Can the kitchen be designed before the wall comes out?

Yes, and it should be. Knowing where the sink, cooker and island will go tells the builder where the opening and services need to be, which saves moving anything twice.

How long is the kitchen out of use?

The structural work comes first and usually takes a week or two including making good. The kitchen fit follows, typically one to two weeks depending on the size of the kitchen and the worktops.

Can the old kitchen become a utility room?

Often, yes, and it is one of the most useful results of opening up. The water and waste are already there, so a washing machine, dryer and sink can go in with little extra plumbing.

Should the back door move at the same time?

Often it makes sense, and the builder does it alongside the main opening, since a new door opening needs a lintel and Building Regulations approval. Planning it with the kitchen design avoids opening the walls twice.

Weighing up your Open-Plan Kitchens?

Send a photo or a quick video of the room on WhatsApp, or get a free fixed quote, no obligation, and we’ll tell you straight what it needs.

WhatsApp us